02/04/15 -
08/05/15 | National Grid (NGG) BBL Company (BBLC) Gasunie Transport
Services (GTS) | Consultation on
CAM Concept
Document | | BBLC, GTS and NGG are holding a joint consultation seeking your views on proposals for: - Implementation principles of the CAM and Balancing European Network Codes between TSOs NGG, BBL and GTS
|
08/04/14 -
06/05/14 | National Grid Gas
(NGG) FluxysBelgium IUK | Consultation on CAM and Zigma Concept Document | | IUK, Fluxys Belgium and NGG are holding a joint consultation seeking your views on proposals for: - Implementation principles of the CAM and Balancing European Network Codes between TSOs National Grid (Gas), IUK and Fluxys
- IUK and Fluxys proposed new entry-exit zone called ZIGMA (Zeebrugge beach Interconnector Gas Market Area)
|
19/12/13 -
20/01/14 | ENTSO-G | Consultation on
the Incremental
Capacity Proposal | | A public consultation on the draft Project Plans for the development of the incremental capacity proposal in accordance with Article 7(1) of Regulation (EC) No 715/2009. |
19/12/13 -
20/01/14 | ENTSO-G | Consultation on
the TAR NC | | A public consultation on the draft Project Plans for the development of the Tariff Network Code in accordance with Article 6(6) of Regulation (EC) No 715/2009. |
05/11/13 -
01/01/14 | NW TSOs | NW GRIP | | A consultation inviting responses regarding the North West Europe Gas Regional Investment Plan (NW GRIP) published by ENTSOG on November 5th 2013. |
31/10/13 -
12/12/13 | Ofgem | Options for GB
implementation of CAM at Bacton | 12th
December
2013 | Options for Great Britain’s implementation of the European Union Network Code on Capacity Allocation Mechanisms in Gas Transmission Systems (Regulation 984/2013) at the Bacton entry point. |
25/07/13 -
02/09/13 | ENTSO-G | Cost Benefit Analysis study | | Consultation on the draft cost benefit analysis for the selection of a data exchange solution in relation to the network code on interoperability and data exchange rules. |
15/07/13 -
07/09/13 | ENTSO-G | 2014 Annual Work Programme | | The ENTSOG Annual Work Programme is based on agreement between the European Commission, ACER and ENTSOG. It sets out a three year plan of work that focuses on network code development, the Ten Year Network Development Plan, Gas Regional Investment Plans and the summer and winter outlooks. |
08/07/13 -
13/09/13 | ENTSO-G | GRIP - Call for
Information | | Call for information on projects to be covered by the second edition of the Gas Regional Investment Plans. |
17/06/13 -
17/08/13 | ENTSO-E | Network Code on
Electricity
Balancing | | The Draft Network Code establishes common rules for Electricity Balancing which involve the establishment of common principles for procurement and common methodology for the activation and settlement of Balancing Services. |
29/05/13 -
21/06/13 | CEER | 2014 Work
Programme | | This consultation document outlines CEER’s work plan for 2014. Centred on four overall strategy focus areas it aims to increase transparency and invite valuable feedback from stakeholders. |
23/05/13 | CEER | Blueprint on
Incremental
Capacity | | The blueprint is intended as input to the discussion on EU wide principles and processed for marketbased investment procedures in gas transmission capacity. |
04/04/13 -
03/05/13 | ENTSO-G | Gas Regional
Investment Plan
2013 | | The North West European Network TSOs are currently drafting their Gas Regional Investment Plan 2013 (NW GRIP 2013). The outline of the report is now publicly available and open for consultation. |
28/03/13 -
28/05/13 | ENTSO-E | Forward Capacity
Allocation Network
Code | | A draft network code setting out the method for long-term capacity calculation and outlining transmission risk hedging instruments. |
22/03/13 -
13/05/13 | ACER | Technical Requirements
for Data Reporting
Under REMIT | 7th May 2013 Document below | This consultation is intended to collect views from all parties interested in the implementation of the Regulation on Wholesale Energy Market Integrity and Transparency (REMIT) |
15/03/13 -
01/05/13 | Ofgem | REMIT | 30th March 2013 Document below | This open letter is designed to help market participants and other stakeholders understand what REMIT is about and how it affects them. It is also an opportunity for all stakeholders to let Ofgem know about a range of issues related to the implementation and application of REMIT in Great Britain. |
12/03/13 -
29/03/13 | Ofgem | Congestion Management Procedures | | This is an open letter that outlines the next steps for the implementation of the network code for Congestion Management Procedures on National Grid Gas and Gas Interconnectors. |
02/03/13 -
31/03/13 | European
Commission | Establishment of the Annual Priority List for 2014 | | This consultation aims to engage stakeholders on the priorities for the development of network codes and guidelines for 2014 and beyond. |
02/05/13 -
02/07/13 | European
Commission | A 2030 framework for climate and energy policies | 2nd July 2013 Document below | This paper launches a public consultation allowing member states, EU institutions and stakeholders to express their views on the type, nature and level of potential climate and energy targets for 2030 as well as important aspects of energy policy. |